Renewable and non-renewable electricity production in Formentera (year to date)
Data up to Oct 2026View the data as a table
| Period | Renewable, year to date (MWh) | Non-renewable, year to date (MWh) |
|---|---|---|
| Jul 2025 | 298.2 | 0 |
| Aug 2025 | 614.4 | 0 |
| Sept 2025 | 878.8 | 0 |
| Oct 2025 | 1,081.3 | 0 |
| Nov 2025 | 1,273.1 | 0 |
| Dec 2025 | 1,482.5 | 0.2 |
| Jan 2026 | 305.7 | 0.3 |
| Feb 2026 | 757.7 | 0.4 |
| Mar 2026 | 1,213.6 | 0.9 |
| Apr 2026 | 1,774.5 | 1 |
| May 2026 | 2,179.4 | 1.1 |
| Jun 2026 | 2,746.5 | 1.1 |
| Jul 2026 | 3,383.8 | 1.1 |
| Aug 2026 | 3,950.8 | 1.1 |
| Sept 2026 | 4,530.1 | 1.1 |
| Oct 2026 | 4,991.7 | 1.2 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown. Cumulative values since January of each year (in 2016, since June): the December value is the year's total. Monthly values are shown in "Electricity production and demand in Formentera".
Renewable electricity production in Formentera (year to date)
Data up to Oct 2026View the data as a table
| Period | Renewable, year to date (MWh) |
|---|---|
| Jul 2025 | 298.2 |
| Aug 2025 | 614.4 |
| Sept 2025 | 878.8 |
| Oct 2025 | 1,081.3 |
| Nov 2025 | 1,273.1 |
| Dec 2025 | 1,482.5 |
| Jan 2026 | 305.7 |
| Feb 2026 | 757.7 |
| Mar 2026 | 1,213.6 |
| Apr 2026 | 1,774.5 |
| May 2026 | 2,179.4 |
| Jun 2026 | 2,746.5 |
| Jul 2026 | 3,383.8 |
| Aug 2026 | 3,950.8 |
| Sept 2026 | 4,530.1 |
| Oct 2026 | 4,991.7 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown. Cumulative values since January of each year (in 2016, since June): the December value is the year's total. Monthly values are shown in "Electricity production and demand in Formentera".
Non-renewable electricity production in Formentera (year to date)
Data up to Oct 2026View the data as a table
| Period | Non-renewable, year to date (MWh) |
|---|---|
| Jul 2025 | 0 |
| Aug 2025 | 0 |
| Sept 2025 | 0 |
| Oct 2025 | 0 |
| Nov 2025 | 0 |
| Dec 2025 | 0.2 |
| Jan 2026 | 0.3 |
| Feb 2026 | 0.4 |
| Mar 2026 | 0.9 |
| Apr 2026 | 1 |
| May 2026 | 1.1 |
| Jun 2026 | 1.1 |
| Jul 2026 | 1.1 |
| Aug 2026 | 1.1 |
| Sept 2026 | 1.1 |
| Oct 2026 | 1.2 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown. Cumulative values since January of each year (in 2016, since June): the December value is the year's total. Monthly values are shown in "Electricity production and demand in Formentera".
Electricity production and demand in Formentera
Data up to Oct 2026View the data as a table
| Period | Production (MWh) | Demand (MWh) |
|---|---|---|
| Jul 2025 | 298.2 | 9,540.3 |
| Aug 2025 | 316.2 | 10,131.3 |
| Sept 2025 | 264.4 | 7,371.1 |
| Oct 2025 | 202.5 | 4,582.2 |
| Nov 2025 | 191.8 | 2,630.2 |
| Dec 2025 | 209.6 | 3,203.2 |
| Jan 2026 | 306 | 3,543.1 |
| Feb 2026 | 452.1 | 3,190.3 |
| Mar 2026 | 456.4 | 3,713.9 |
| Apr 2026 | 561 | 3,898.2 |
| May 2026 | 405 | 5,269.6 |
| Jun 2026 | 567.1 | 7,775.8 |
| Jul 2026 | 637.3 | 11,083.8 |
| Aug 2026 | 567 | 11,375 |
| Sept 2026 | 579.3 | 8,180.6 |
| Oct 2026 | 461.7 | 5,238.5 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown.
Electricity production in Formentera by source
Data up to Oct 2026View the data as a table
| Period | Solar PV (MWh) | Power plant (MWh) | Auxiliary generator sets (MWh) |
|---|---|---|---|
| Jul 2025 | 298.2 | 0 | 0 |
| Aug 2025 | 316.2 | 0 | 0 |
| Sept 2025 | 264.4 | 0 | 0 |
| Oct 2025 | 202.5 | 0 | 0 |
| Nov 2025 | 191.8 | 0 | 0 |
| Dec 2025 | 209.4 | 0.2 | 0 |
| Jan 2026 | 305.7 | 0.3 | 0 |
| Feb 2026 | 452 | 0.1 | 0 |
| Mar 2026 | 455.8 | 0.6 | 0 |
| Apr 2026 | 560.9 | 0.1 | 0 |
| May 2026 | 404.9 | 0.1 | 0 |
| Jun 2026 | 567.1 | 0 | 0 |
| Jul 2026 | 637.3 | 0 | 0 |
| Aug 2026 | 567 | 0 | 0 |
| Sept 2026 | 579.3 | 0 | 0 |
| Oct 2026 | 461.6 | 0.1 | 0 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown.
Electricity demand in Formentera
Data up to Oct 2026View the data as a table
| Period | Demand (MWh) |
|---|---|
| Jul 2025 | 9,540.3 |
| Aug 2025 | 10,131.3 |
| Sept 2025 | 7,371.1 |
| Oct 2025 | 4,582.2 |
| Nov 2025 | 2,630.2 |
| Dec 2025 | 3,203.2 |
| Jan 2026 | 3,543.1 |
| Feb 2026 | 3,190.3 |
| Mar 2026 | 3,713.9 |
| Apr 2026 | 3,898.2 |
| May 2026 | 5,269.6 |
| Jun 2026 | 7,775.8 |
| Jul 2026 | 11,083.8 |
| Aug 2026 | 11,375 |
| Sept 2026 | 8,180.6 |
| Oct 2026 | 5,238.5 |
Own elaboration based on Red Eléctrica's real-time demand viewer (demanda.ree.es), Formentera electricity system. REE publishes power every 5 minutes and each month's energy is the sum of power times duration. Production: electricity generated on the island. Renewable: solar PV. Non-renewable: the Formentera power plant (gas turbines and diesel engines) and the auxiliary generator sets brought in for the summer. The rest of the demand arrives through the submarine cable from Ibiza and is not counted as production. When the source reports impossible generation (above demand minus cable, as in May and June 2024), generation at that moment is rebuilt as demand minus cable; and when the solar sensor gets stuck (solar at night, mostly between 2018 and 2020), that reading is replaced by the month's average solar profile and demand is corrected accordingly. The series starts in June 2016, the first full month REE publishes; the current month is not shown.
Monthly electricity demand in the Balearic Islands (approximation)
Data up to Oct 2026View the data as a table
| Period | Demand (MWh) |
|---|---|
| Jan 2015 | 450,338 |
| Feb 2015 | 432,565 |
| Mar 2015 | 438,112 |
| Apr 2015 | 396,128 |
| May 2015 | 449,841 |
| Jun 2015 | 522,860 |
| Jul 2015 | 695,626 |
| Aug 2015 | 655,990 |
| Sept 2015 | 523,712 |
| Oct 2015 | 447,095 |
| Nov 2015 | 368,535 |
| Dec 2015 | 407,167 |
| Jan 2016 | 409,886 |
| Feb 2016 | 403,364 |
| Mar 2016 | 448,749 |
| Apr 2016 | 413,043 |
| May 2016 | 471,215 |
| Jun 2016 | 533,333 |
| Jul 2016 | 642,436 |
| Aug 2016 | 650,485 |
| Sept 2016 | 569,439 |
| Oct 2016 | 477,814 |
| Nov 2016 | 384,773 |
| Dec 2016 | 418,653 |
| Jan 2017 | 477,380 |
| Feb 2017 | 395,605 |
| Mar 2017 | 408,892 |
| Apr 2017 | 415,203 |
| May 2017 | 482,230 |
| Jun 2017 | 578,282 |
| Jul 2017 | 677,704 |
| Aug 2017 | 706,662 |
| Sept 2017 | 536,768 |
| Oct 2017 | 475,043 |
| Nov 2017 | 403,689 |
| Dec 2017 | 458,958 |
| Jan 2018 | 436,554 |
| Feb 2018 | 457,600 |
| Mar 2018 | 461,730 |
| Apr 2018 | 426,817 |
| May 2018 | 475,878 |
| Jun 2018 | 536,318 |
| Jul 2018 | 685,541 |
| Aug 2018 | 704,133 |
| Sept 2018 | 577,983 |
| Oct 2018 | 476,157 |
| Nov 2018 | 396,695 |
| Dec 2018 | 422,003 |
| Jan 2019 | 477,796 |
| Feb 2019 | 415,344 |
| Mar 2019 | 436,816 |
| Apr 2019 | 446,408 |
| May 2019 | 477,010 |
| Jun 2019 | 539,722 |
| Jul 2019 | 719,465 |
| Aug 2019 | 705,099 |
| Sept 2019 | 572,624 |
| Oct 2019 | 490,427 |
| Nov 2019 | 412,702 |
| Dec 2019 | 421,812 |
| Jan 2020 | 456,464 |
| Feb 2020 | 403,436 |
| Mar 2020 | 403,833 |
| Apr 2020 | 321,712 |
| May 2020 | 327,175 |
| Jun 2020 | 360,865 |
| Jul 2020 | 528,919 |
| Aug 2020 | 566,319 |
| Sept 2020 | 403,465 |
| Oct 2020 | 368,113 |
| Nov 2020 | 364,441 |
| Dec 2020 | 436,983 |
| Jan 2021 | 470,924 |
| Feb 2021 | 361,716 |
| Mar 2021 | 410,108 |
| Apr 2021 | 378,811 |
| May 2021 | 380,443 |
| Jun 2021 | 459,728 |
| Jul 2021 | 601,270 |
| Aug 2021 | 632,605 |
| Sept 2021 | 544,053 |
| Oct 2021 | 444,701 |
| Nov 2021 | 408,606 |
| Dec 2021 | 435,319 |
| Jan 2022 | 464,917 |
| Feb 2022 | 397,170 |
| Mar 2022 | 441,910 |
| Apr 2022 | 436,274 |
| May 2022 | 471,932 |
| Jun 2022 | 575,203 |
| Jul 2022 | 702,367 |
| Aug 2022 | 728,931 |
| Sept 2022 | 594,747 |
| Oct 2022 | 466,805 |
| Nov 2022 | 362,646 |
| Dec 2022 | 398,799 |
| Jan 2023 | 454,056 |
| Feb 2023 | 434,678 |
| Mar 2023 | 417,305 |
| Apr 2023 | 408,239 |
| May 2023 | 464,354 |
| Jun 2023 | 551,249 |
| Jul 2023 | 741,602 |
| Aug 2023 | 707,967 |
| Sept 2023 | 569,181 |
| Oct 2023 | 498,668 |
| Nov 2023 | 377,482 |
| Dec 2023 | 422,387 |
| Jan 2024 | 449,315 |
| Feb 2024 | 410,088 |
| Mar 2024 | 431,347 |
| Apr 2024 | 433,964 |
| May 2024 | 479,676 |
| Jun 2024 | 541,044 |
| Jul 2024 | 685,338 |
| Aug 2024 | 733,546 |
| Sept 2024 | 557,428 |
| Oct 2024 | 504,439 |
| Nov 2024 | 385,174 |
| Dec 2024 | 452,590 |
| Jan 2025 | 458,814 |
| Feb 2025 | 420,397 |
| Mar 2025 | 454,444 |
| Apr 2025 | 428,474 |
| May 2025 | 477,885 |
| Jun 2025 | 625,998 |
| Jul 2025 | 733,191 |
| Aug 2025 | 730,717 |
| Sept 2025 | 604,711 |
| Oct 2025 | 500,785 |
| Nov 2025 | 418,378 |
| Dec 2025 | 467,142 |
| Jan 2026 | 501,114 |
| Feb 2026 | 400,635 |
| Mar 2026 | 465,732 |
| Apr 2026 | 440,566 |
| May 2026 | 495,228 |
| Jun 2026 | 619,508 |
| Jul 2026 | 835,662 |
| Aug 2026 | 853,809 |
| Sept 2026 | 640,749 |
| Oct 2026 | 520,943 |
Red Eléctrica de España (apidatos.ree.es), Balearic electricity system. REE does not publish Formentera separately: this is the closest available approximation with automatic updates.
Renewable and non-renewable electricity generation in the Balearic Islands (approximation)
Data up to Oct 2026View the data as a table
| Period | Renewable (MWh) | Non-renewable (MWh) |
|---|---|---|
| Jan 2015 | 16,874 | 322,566 |
| Feb 2015 | 14,987 | 305,693 |
| Mar 2015 | 22,248 | 315,128 |
| Apr 2015 | 26,873 | 281,649 |
| May 2015 | 29,098 | 355,073 |
| Jun 2015 | 27,500 | 372,069 |
| Jul 2015 | 27,201 | 487,365 |
| Aug 2015 | 24,987 | 460,618 |
| Sept 2015 | 25,072 | 379,082 |
| Oct 2015 | 24,282 | 323,436 |
| Nov 2015 | 22,888 | 273,869 |
| Dec 2015 | 18,996 | 294,622 |
| Jan 2016 | 16,352 | 304,321 |
| Feb 2016 | 13,333 | 298,814 |
| Mar 2016 | 20,158 | 317,124 |
| Apr 2016 | 24,105 | 301,982 |
| May 2016 | 27,713 | 338,147 |
| Jun 2016 | 27,056 | 381,533 |
| Jul 2016 | 25,621 | 471,973 |
| Aug 2016 | 26,544 | 471,403 |
| Sept 2016 | 23,226 | 436,953 |
| Oct 2016 | 22,496 | 364,434 |
| Nov 2016 | 16,363 | 309,431 |
| Dec 2016 | 15,071 | 318,453 |
| Jan 2017 | 13,971 | 366,758 |
| Feb 2017 | 14,834 | 316,209 |
| Mar 2017 | 23,014 | 307,526 |
| Apr 2017 | 27,747 | 330,383 |
| May 2017 | 25,183 | 382,019 |
| Jun 2017 | 27,656 | 436,393 |
| Jul 2017 | 27,603 | 494,889 |
| Aug 2017 | 27,027 | 512,758 |
| Sept 2017 | 25,662 | 395,001 |
| Oct 2017 | 24,003 | 357,755 |
| Nov 2017 | 19,007 | 314,520 |
| Dec 2017 | 16,058 | 351,133 |
| Jan 2018 | 14,998 | 335,352 |
| Feb 2018 | 10,284 | 347,322 |
| Mar 2018 | 21,998 | 349,735 |
| Apr 2018 | 22,378 | 337,971 |
| May 2018 | 22,734 | 363,578 |
| Jun 2018 | 27,349 | 400,346 |
| Jul 2018 | 28,039 | 495,711 |
| Aug 2018 | 26,810 | 524,189 |
| Sept 2018 | 22,980 | 447,072 |
| Oct 2018 | 22,628 | 361,521 |
| Nov 2018 | 13,690 | 317,937 |
| Dec 2018 | 20,443 | 288,984 |
| Jan 2019 | 17,764 | 322,776 |
| Feb 2019 | 16,795 | 279,326 |
| Mar 2019 | 23,280 | 291,211 |
| Apr 2019 | 24,845 | 297,132 |
| May 2019 | 26,723 | 307,126 |
| Jun 2019 | 27,131 | 352,957 |
| Jul 2019 | 27,260 | 491,039 |
| Aug 2019 | 25,239 | 494,091 |
| Sept 2019 | 24,266 | 395,161 |
| Oct 2019 | 24,590 | 328,171 |
| Nov 2019 | 20,760 | 300,545 |
| Dec 2019 | 15,080 | 287,118 |
| Jan 2020 | 15,769 | 304,540 |
| Feb 2020 | 15,253 | 272,255 |
| Mar 2020 | 20,300 | 270,752 |
| Apr 2020 | 15,900 | 225,230 |
| May 2020 | 18,630 | 228,599 |
| Jun 2020 | 26,845 | 240,731 |
| Jul 2020 | 23,800 | 336,786 |
| Aug 2020 | 23,149 | 360,453 |
| Sept 2020 | 25,115 | 262,075 |
| Oct 2020 | 16,319 | 245,851 |
| Nov 2020 | 19,991 | 248,122 |
| Dec 2020 | 15,668 | 283,053 |
| Jan 2021 | 16,077 | 316,596 |
| Feb 2021 | 20,473 | 227,831 |
| Mar 2021 | 23,832 | 258,290 |
| Apr 2021 | 22,655 | 245,134 |
| May 2021 | 28,540 | 240,301 |
| Jun 2021 | 34,846 | 359,452 |
| Jul 2021 | 34,645 | 520,746 |
| Aug 2021 | 35,020 | 557,477 |
| Sept 2021 | 30,005 | 476,499 |
| Oct 2021 | 23,739 | 382,676 |
| Nov 2021 | 22,988 | 357,183 |
| Dec 2021 | 20,351 | 382,697 |
| Jan 2022 | 24,809 | 408,948 |
| Feb 2022 | 23,811 | 345,856 |
| Mar 2022 | 24,014 | 387,207 |
| Apr 2022 | 30,659 | 371,974 |
| May 2022 | 39,524 | 400,361 |
| Jun 2022 | 42,627 | 497,351 |
| Jul 2022 | 49,356 | 585,978 |
| Aug 2022 | 43,443 | 607,835 |
| Sept 2022 | 38,764 | 485,335 |
| Oct 2022 | 35,006 | 370,434 |
| Nov 2022 | 27,628 | 279,027 |
| Dec 2022 | 26,128 | 292,893 |
| Jan 2023 | 26,244 | 303,861 |
| Feb 2023 | 32,679 | 312,265 |
| Mar 2023 | 45,819 | 289,292 |
| Apr 2023 | 49,779 | 260,427 |
| May 2023 | 47,082 | 298,510 |
| Jun 2023 | 53,080 | 373,819 |
| Jul 2023 | 54,297 | 518,757 |
| Aug 2023 | 59,526 | 473,432 |
| Sept 2023 | 45,037 | 393,289 |
| Oct 2023 | 44,257 | 322,964 |
| Nov 2023 | 36,394 | 270,352 |
| Dec 2023 | 32,258 | 277,718 |
| Jan 2024 | 34,795 | 291,780 |
| Feb 2024 | 36,434 | 258,920 |
| Mar 2024 | 58,198 | 262,511 |
| Apr 2024 | 56,000 | 268,605 |
| May 2024 | 70,704 | 291,235 |
| Jun 2024 | 69,966 | 325,760 |
| Jul 2024 | 76,124 | 400,760 |
| Aug 2024 | 71,423 | 474,168 |
| Sept 2024 | 58,606 | 336,822 |
| Oct 2024 | 48,551 | 311,415 |
| Nov 2024 | 37,017 | 270,006 |
| Dec 2024 | 37,752 | 336,868 |
| Jan 2025 | 37,757 | 335,628 |
| Feb 2025 | 38,975 | 290,637 |
| Mar 2025 | 44,096 | 297,132 |
| Apr 2025 | 62,250 | 280,923 |
| May 2025 | 65,878 | 301,579 |
| Jun 2025 | 79,216 | 375,779 |
| Jul 2025 | 72,418 | 472,405 |
| Aug 2025 | 70,308 | 451,802 |
| Sept 2025 | 62,177 | 376,329 |
| Oct 2025 | 47,199 | 334,343 |
| Nov 2025 | 42,313 | 299,170 |
| Dec 2025 | 31,850 | 315,108 |
| Jan 2026 | 35,903 | 326,675 |
| Feb 2026 | 44,299 | 253,708 |
| Mar 2026 | 53,667 | 307,167 |
| Apr 2026 | 76,195 | 266,837 |
| May 2026 | 70,852 | 310,402 |
| Jun 2026 | 85,674 | 379,644 |
| Jul 2026 | 84,264 | 540,151 |
| Aug 2026 | 82,834 | 570,331 |
| Sept 2026 | 72,366 | 432,383 |
| Oct 2026 | 58,302 | 359,863 |
Red Eléctrica de España (apidatos.ree.es), Balearic electricity system. REE does not publish Formentera separately: this is the closest available approximation with automatic updates.